1. Main way it works
In Electron Beam Melting (EBM) technology, high-energy electron beams melt metal powders one layer at a time in a vacuum. Its vacuum system has three main jobs:
Guarantee of the electron beam path: In a high vacuum of 4 × 10 ⁻¹ Pa, the average free path of the electron beam can reach tens of meters. This keeps the energy from being lost when the beam hits gas molecules and makes sure that the melt pool is accurate to within ± 0.2mm.
Preventing oxidation of materials: In a vacuum, the oxidation rate of active materials like titanium alloy (Ti6Al4V) drops by 99.7%, and the powder recovery rate rises from 75% in the SLM method to 92%. The cost of printing one page goes down by 30%.
Better degassing effect: The vacuum environment lowers the gas solubility in the melt pool by 80% and the porosity from 0.5% of SLM to 0.02%, which greatly increases the fatigue life of the parts.
2. Plan for putting the equipment into use
For example, the EBM system from Pfeiffer Vacuum in Germany uses a three-level vacuum architecture:
The Roots pump and the rotary vane pump work together to provide rough pumping, lowering the pressure in the chamber from atmospheric pressure to 10⁻¹ Pa in just 3 minutes.
Group of high vacuum pumps: The molecular pump and titanium sublimation pump operate together to generate a vacuum of 5 × 10⁻⁵ Pa, which is the highest EBM needs for electron beam stability.
System for finding leaks: The helium mass spectrometer leak detector keeps an eye on the chamber's sealing in real time and keeps the cumulative leakage rate below 1 × 10⁻⁹ Pa · m³/s to keep the printing process stable for a long period.
3. Limits on the process
Costs of equipment are high: High vacuum systems represent up 40% of the total cost of EBM equipment, and maintenance expenses are 2.3 times greater than SLM procedures.
Limited material adaptability: it only works with the electron beam melting process and not with laser melting technologies like SLM.
Limitation on the manufacturing cycle: Vacuum pumping takes up 25% of the single piece production cycle, which makes it much less efficient when producing large quantities.
2, Airflow cleaning technology: a big step forward in the LPBF process
1. New ideas in technology
EOS produced the AirSword for big LPBF (laser powder bed melting) machines. The airflow management system makes three big improvements by optimising fluid dynamics:
Laminarization design: By using a mix of rectifier channels and air guide fins, the standard deviation of airflow velocity is lowered from the usual 1.2m/s to 0.3m/s, getting rid of the vortex zone inside the cavity.
Thermodynamics control: The fins have circulating cooling liquid inside them that keeps the airflow temperature from changing by more than 5 degrees Celsius. This stops powder from clumping together due to thermal stress.
Coupling of many physical fields: A CFD simulation was used to improve the air duct structure, which led to a smoke and dust removal effectiveness of 98.7% in a 1.5m × 1.5m building area. This is 42% better than the old way of cross ventilation.
2. Examples of engineering implementation
When using AMCM M8K equipment, the AirSword™ system shows a lot of benefits:
Protection for the optical system: The transmittance of the protective lens stays at 99.2% even after 200 hours of continuous printing. This means that the maintenance cycle lasts five times longer than with standard solutions.
Better use of powder: The oxygen level in the chamber is kept stable below 50ppm, which lowers the oxidation rate of nickel-based alloy powder from 0.8% to 0.15%.
Breakthrough in how much stuff we can make: The printing cycle time for making aviation structural parts that are 1m 1m 0.5m was cut down to 72 hours, which is 35% faster than the vacuum method.
3. Technical limits
Limitation on material activity: For materials that are very sensitive to oxidation, such titanium alloys, protection with an inert gas (like argon partial pressure 99.999%) is needed, which raises operating expenses.
Requirements for sealing equipment: To keep outside particles from getting in and messing with the flow of air, the air duct system must have an IP67 protection rating.
Size limit for buildings: If the building area is more than 2m 2m and the length of the airflow channel is more than the critical value of fluid mechanics, a partitioned independent wind field design is needed.
3, Decision matrix for process adaptability
The size of the building must be between 0.35m 0.35m 0.38m and 1m 1m 0.5m (it can be made bigger).
High cost of equipment (40% of the total cost of equipment)
Low production efficiency (25% hoover use) and high (ability to run all the time)
Some common places to use them are on turbine blades for aeroplane engines, medical implants, huge structural parts for aeroplanes, and moulds for cars.